logo

Types of Contracts

  • One planned maintenance visit carried out, during normal hours, per annum by qualified Linet personnel on all contract-covered equipment (Schedule of work to be mutually agreed between both parties)
  • Priority engineer call-out response
  • Inclusive of all ‘Call-Out Charges’ for emergency breakdowns during normal hours
  • Inclusive of all ‘Labour Charges’
  • Inclusive of all ‘Spare Parts’ (excludes consumable items such as batteries.)
  • Inclusive of ‘Electrical Safety Test’ prior to release of the bedframes back into service
  • Linet Engineer on-site response within 48 hours
  • One planned maintenance visit carried out, during normal hours, per annum by qualified Linet personnel on all contract-covered equipment (Schedule of work to be mutually agreed between both parties)
  • Priority engineer call-out response
  • Inclusive of all ‘Call-Out Charges’ for emergency breakdowns during normal hours
  • Inclusive of all ‘Labour Charges’
  • 10% discount off any spare parts
  • Inclusive of ‘Electrical Safety Test’ prior to release of the bedframes back into service
  • Linet Engineer on-site response within 48 hours
  • One planned maintenance visit carried out, during normal hours, per annum by qualified Linet personnel on all contract-covered equipment (Schedule of work to be mutually agreed between both parties)
  • Priority engineer call-out response
  • Discounted emergency breakdown call-out rates
  • 10% discount off any spare parts
  • Inclusive of ‘Electrical Safety Test’ prior to release of the bedframes back into service
  • Linet Engineer on-site response within 48 hours
  • One planned maintenance visit carried out, during normal hours, per annum by qualified Linet personnel on all contract-covered equipment (Schedule of work to be mutually agreed between both parties)
  • Warranty parts replaced if required with all labour and call-out charges included
  • 10% discount off any spare parts required e.g. Consumable items such as batteries or user related damage parts as these are excluded from the contract.
  • Inclusive of ‘Electrical Safety Test’ prior to release of the bedframes back into service
  • Linet Engineer on-site response within 48 hours

Back

Leslie Smith Managing Director UK 

Leslie Smith
Managing Director UK

"By entering into and concluding the contract we assume liablility for the professional inspection and maintenance of the safe function of beds and mattresses. A great benefit is lower costs associated with compulsory inspections or quick intervention in post-warranty repairs."

Contact us